Stonehaven

STONEHAVEN

STONEHAVEN

1.0 What are the daily capacities and Manufacturing Lead Time of geldting secure and Lasting Cutting, Department considering a degree Celsius couple up peck i b t h 10 duplicate batch?

bare-assed DEPARTMENT

100 pair batch Capacity, CT and MLT

CUTTING DEPARTMENT
100 pair batch Cutting tog whip 4* (5.25 100*0 05) 4 (5 25 + 100 0.05) = 41 minutes

Leathe rSheets

Cut Linings 4* (5.00 + 100*0.05) = 40 minutes Cut insole 4* (4 00 + 100*0.04) = 32 (4.00 100*0 04) minutes

There are three replicate operations each of which cuts 100 of four different skid operations, components (creating 1200 pieces in 100 pair batch), each of which requires Four frighten away changes

CUTTING DEPARTMENT
100 pair batch Cutting garment leather 4* (5.25 100*0 05) 4 (5 25 + 100 0.05) = 41 minutes

Leathe rSheets

Cut Linings 4* (5.00 + 100*0.05) = 40 minutes Cut insole 4* (4 00 + 100*0.04) = 32 (4.00 100*0 04) minutes

Capacity = 480/41 = 11 7 batches = 1170 pairs of shoe per shift 11.7 MLT = 41 minutes. calendar method of birth control time = 41 minutes

CUTTING DEPARTMENT

10 pair batch Capacity, CT and MLT

CUTTING DEPARTMENT
10 pair batch Cutting Shoe leather 4* (5.25 4 (5 25 + 10 * 0 05) = 0.05) 23 minutes

Leathe rSheets

Cut Linings 4* (5.00 + 10 * 0.05) = 22 minutes Cut insole 4* (4 00 + 10 * 0.04) = (4.

Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.

00 0 04) 17.6 minutes

Capacity = 480/23 = 20 9 batches = 209 pairs of shoe per shift 20.9 MLT = 23 minutes. Cycle Time = 23 minutes

CUTTING DEPARTMENT

While changing from a 100 pair batch to a 10 pair batch, batch the MLT declines 44 % but the capacity %, declines a whooping 82 % - function of the setups, y g p which are comparatively long compared to the run times?

STITCHING DEPARTMENT

STITCHING DEPARTMENT

contempt the strange back and forth flow of baskets to and from workers and supervisors in secure this is stitching, a classic worker-paced line, with operations in q sequence.

STITCHING DEPARTMENT

100 pair batch Capacity, CT and MLT...If you want to get a full essay, order it on our website: Orderessay